The Volgograd airport Runway Supervisory Unit (RSU) construction and equipment is completed

The Volgograd airport Runway Supervisory Unit (RSU) construction and equipment is completed

The multipurpose project of the Volgograd (Gumrak) airport construction and equipment with Runway Supervisory Unit (RSU) based on SEGMENT modules is successfully completed. The project was carried out within the Volgograd airport preparation to host the 2018 FIFA World Cup. The operational readiness of the facility is confirmed. The Gumrak airport equipment was carried out […]

Read more
The ATC Automated System of Tyumen consolidated ATC centre has been put in commission

The ATC Automated System of Tyumen consolidated ATC centre has been put in commission

The operation tests of the ATC Automated System of Tyumen consolidated ATC centre have been completed with a positive result. The Commission of the General Directorate representatives and Federal State Unitary Enterprise “State Research Institute of Civil Aviation”, the North Siberia Air Navigation branch and NITA, LLC confirmed the readiness of the new system for […]

Read more
Сompletion of ATC Automation system site-acceptance testing in Yekaterinburg

Сompletion of ATC Automation system site-acceptance testing in Yekaterinburg

The site-acceptance testing of new ATC Automation System has been successfully completed in Yekaterinburg Consolidated ATC Centre. The testing program is carried out in full. Trans-Siberian system of transit routing connecting Europe airports with Japan, China and Korea airports are controlled by the new centre. The controlled airspace is 686.6 thousand km². Air route segment […]

Read more