Consoles Series 6 type testing

ATCO Consoles Series 6 type testing was carried out at the manufacturing site of the company on 25 April. The committee comprising representatives of branch of “State ATM Corporation” Federal State Unitary Enterprise “Aero navigation of North-West”, Federal State Unitary Enterprise GosNII GA, Military Representative Office of the Ministry of Defence of the Russian Federation […]

Read more
TOWER SIMULATOR IS COMMISSIONED IN DOMODEDOVO ATC CENTRE

TOWER SIMULATOR IS COMMISSIONED IN DOMODEDOVO ATC CENTRE

One of the most long-term projects of the company aimed at supplying Tower simulator with 360 degrees situational awareness visualization to Domodedovo ATC Centre is successfully completed. Domodedovo Tower simulator is the second one in Russia realized with 360 degrees visualization. Tower module is performed in “3х3” configuration comprising 3 trainer workstations, 2 controller workstations […]

Read more

Commissioning of Yekaterinburg ATC Centre ATM automation system

The new ATC centre commissioning ceremony was held on Monday 10 December with the participation of representatives of Mintrans of Russia, OJSC “Concern VKO “Almaz-Antej” and FSUE “State ATM Corporation”. Trans-Siberian system of transit routing connecting Europe airports with Japan, China and Korea airports are controlled by Yekaterinburg Consolidated ATC Centre. The controlled airspace is […]

Read more
The Volgograd airport Runway Supervisory Unit (RSU) construction and equipment is completed

The Volgograd airport Runway Supervisory Unit (RSU) construction and equipment is completed

The multipurpose project of the Volgograd (Gumrak) airport construction and equipment with Runway Supervisory Unit (RSU) based on SEGMENT modules is successfully completed. The project was carried out within the Volgograd airport preparation to host the 2018 FIFA World Cup. The operational readiness of the facility is confirmed. The Gumrak airport equipment was carried out […]

Read more
The ATC Automated System of Tyumen consolidated ATC centre has been put in commission

The ATC Automated System of Tyumen consolidated ATC centre has been put in commission

The operation tests of the ATC Automated System of Tyumen consolidated ATC centre have been completed with a positive result. The Commission of the General Directorate representatives and Federal State Unitary Enterprise “State Research Institute of Civil Aviation”, the North Siberia Air Navigation branch and NITA, LLC confirmed the readiness of the new system for […]

Read more
Сompletion of ATC Automation system site-acceptance testing in Yekaterinburg

Сompletion of ATC Automation system site-acceptance testing in Yekaterinburg

The site-acceptance testing of new ATC Automation System has been successfully completed in Yekaterinburg Consolidated ATC Centre. The testing program is carried out in full. Trans-Siberian system of transit routing connecting Europe airports with Japan, China and Korea airports are controlled by the new centre. The controlled airspace is 686.6 thousand km². Air route segment […]

Read more
  • 1
  • 4
  • 5